Brevan Supply

FOR ARCHITECTS, DEVELOPERS AND GENERAL CONTRACTORS

One contract for the made-to-order parts of a building.

Windows, cabinetry, countertops and flooring — one line, or the whole package — bought direct from established factories in Asia and Europe and delivered to your site under one U.S. contract.

Start a project How a job runs

1 · WHAT WE SUPPLY

ELEVATION · ONE PROJECTSCALE: NTS
02Doors
03Cabinetry
01 · THE LIT PANEWindows
04Countertops
05Flooring
06On request
The lit pane is the factory picked for your job. Doors go in only with impact or historic windows.
WindowsWHERE MOST PROJECTS START
CabinetryWith countertops and sinks, as one package
CountertopsQuartz — with the cabinetry, or alone
FlooringEngineered and carpet
DoorsWith impact or historic windows

2 · WHEN WE’RE THE RIGHT SUPPLIER

We take the jobs where the spec is demanding and the order fills a container.

  1. Made to orderBuilt to the job’s drawings. If it can come off a shelf, we are not the supplier.
  2. A catalog product won’t passHistoric replica profiles, hurricane impact ratings, energy or sound requirements.
  3. One order, one shipmentOne order for the building, shipped together.

3 · HOW A JOB RUNS

We are an international supplier, not tied to one manufacturer. We buy direct from established factories in Asia and Europe, take title, and handle shop drawings, import, duty and delivery to the site. Buying direct puts a demanding spec within reach of the budget.

STEP 01

You send the drawings

Plans, a schedule or spec sections. No drawings yet is fine.

STEP 02

One all-in price

Duty and freight written in, including what happens if a tariff moves.

STEP 03

Shop drawings

Drawn to your project. Nothing is built until you sign them.

STEP 04

A full-size prototype on site

The project team approves it before production starts.

STEP 05

Production and import

We handle the import, duty and freight.

STEP 06

Delivered to the site

Install by a Brevan Certified partner — in the package where we cover it, or hired by your general contractor.

4 · WHY BREVAN

Not tied to one factory, and it changes the whole deal.

4.1 The factory fits the job
A one-factory supplier sells you that factory’s answer. We are an international supplier: we choose the factory after we’ve seen your drawings. That choice is the lit pane in our mark.
4.2 Factory-direct, with title
We buy direct from established factories in Asia and Europe and take title to the goods. Buying direct puts a demanding spec within reach of the budget.
4.3 Tariffs, in writing
Duty and freight are written into the contract before you sign, including what happens if a tariff moves.
4.4 Proof before production
A full-size prototype goes to the site for the project team to approve before production starts.
4.5 Recent award
The cabinetry, quartz countertop and sink package at The Peterson, Charlotte — 49 residences over five stories, awarded October 2026, delivering summer 2027.

5 · PEOPLE

[PHOTO]
Andreas EggerFactories, product and pricingRuns Brevan’s supply side: the factories, the product lines and the pricing. A career spent in direct import for hospitality projects, building the factory relationships Brevan buys through.
[PHOTO]
Brett CallaghanProjects and construction[2–3 personal bio lines — to come]
[PHOTO]
Zach PonceletProject intake and estimating[2–3 personal bio lines — to come]
[PHOTO]
Paul GradeffOperations and contracts[2–3 personal bio lines — to come]
[PHOTO]
Helmut GrohschaedlBrevan Certified install partner · hired by your GC[2–3 bio lines from Andreas — his own install record]